New siding on The Hoopeston Lorraine Theater II was part of a complete remodel. New highback seats were also installed at the Lorraine and the Lorraine II.
Built 2 Last Construction
Below are photos of productions rooms in a local factory.
One of our recent residential projects included new siding, windows, and doors on the home shown below.
Just completed, this attic was turned into a master suite.
These are a few pictures from a recent 640 square foot addition that included a family room, bedroom, bath, and a complete kitchen remodel.
Built 2 Last Construction* 206 S. Market Street* Hoopeston * IL * 60942 Phone: (217) 772-1202 Fax: (217) 283-5475